Corona Lines Ltd

Corona Lines Ltd started, as the name suggests, as a lockdown project during the Coronavirus pandemic in 2020. However, it only got as far as the initial track laying during that time.

This layout is a micro layout on an A3-size baseboard (42cmx29cm). To demonstrate the art of the possible in this space, it has a full circuit of OO track. The layout is therefore limited to the smallest OO stock, 4-wheel locomotives and stock and even those must be of the shortest wheelbase possible!